SMED shortens die and model changeover. The aim is to bring the changeover down to minutes. As the changeover shortens, the batch shrinks, and stock and waiting fall.
What does SMED shorten?
- Details
- Written by: Cevdet Dal
- Category: Lean production system help
- Hits: 22