Introduction

Nowadays, customer demands are diversifying and the number of requests is decreasing rapidly. Especially companies or dealers selling through e-commerce systems face a high demand for their products. Delivery speed is also getting shorter and even same day cargo is demanded. There are two ways to meet these demands. The first of these is to keep stock, in which case serious stock quantities emerge in the market where the variety is high, and the second way is to meet the demands by producing directly. In this case, a system will be needed to produce the daily demand at once. High model changeover times will be our biggest obstacle. If you cannot reduce the times, you will lose your competitiveness as product costs will increase. SMED gives you this power and you even get ahead of the competition. Because it is possible to reduce the model change time to single minutes under all conditions.

With SMED application consultancy, your company achieves the following benefits.
  • Determining current model change times and establishing a measurement system,
  • Teaching SMED, 5S and KAIZEN techniques to employees,
  • Better learning of machines by employees,
  • Gradually reducing supply and production batch sizes in the stock management system,
  • Adapting the planning system to new model change times,
  • Planning and implementation of technical improvements for SMED,
  • Improving quality, reducing the defective production rate to less than 1%,

How we work?

Before providing service to you, we visit your company by applying the principle of "GECHI GEMBUTSU" (go and see it), which is one of the basic principles of lean thinking. In order to form our basic opinions about your company, determine the scope of the project to be implemented, and get the opinions of the company management about lean thinking, we determine the project draft by having a meeting that will last 1 - 2 hours, a general visit to the company facilities and an exchange of views.

The SMED IMPLEMENTATION PROJECT proposal prepared by your visiting consultant is presented to the relevant authorized person one week after the visit.

Our consultancy service is provided directly on site. Although there are meeting room trainings, the real service is obtained through one-on-one practice in the field. All of our consultants are people who experience the results of lean production implementation in a permanent way.

Project outline

 
  • General information: Contains general information about SMED and lean manufacturing practices.
  • Scope: The results of the SMED system applications within the scope of the project and the way of implementation are briefly explained.
  • Project time plan: It is the project plan showing the time required to implement the SMED, 5S and KAIZEN system within the scope of the project and the amount of consultancy services to be provided during this period in terms of man-days.
  • Pricing: Information about the man-day unit price, the monthly invoice amount and the total project cost.
  • General information about contact and our consultants who may take part in the project and our references

General informatio

Through discussions on the project draft, customer needs are fully reflected in the project. By providing the necessary support to our customers until the kick-off meeting, we ensure that the necessary preparations are made completely and as required until the beginning of the project. This ensures that our customers do the right job with the right start.

A consultancy agreement is drawn up with the company before or immediately after the start of the project.

Details

İletişim bilgileri

T. +90 282 717 0429